Our unique loop-jack is engineered to work in tandem, the right and left side models are differentiated by the position of the pump.

Prior to utilisation, a visual inspection is recommended for the following components:
Prior to the mounting of loop jacks, workers must check the stability of scaffolds that must be assembled correctly as required by construction safety codes.
To raise the working platform, operators must perform in tandem the following operations:
To lower the working platform, operators must inverse the operation sequence, always in tandem:
Position the jack vertically, attach the safety cable around the vertical side post, attach the top hook around the vertical post and on the side transversal bar, attach the two median hooks around the vertical post as shown in the photos to your right.
The number of wooden boards can be double for a more stable platform.
Never lay the top hook on the wooden board as shown in the following picture; this position of the top hook can swing the lifting piston out of vertical position and drop the jack down.